Reaching Higher: News & Recent Highlights

Reaching Higher

Ridership on the Rise!

One year in, Cap Remap has done what it promised — created a more frequent, more reliable and better connected bus system. It’s improved the customer’s experience by tripling the number of routes that come every 15 minutes, 7 days a week and by increasing bus stop accessibility, with new sidewalks and more bus shelters for previously underserved communities.

Ridership Since Cap Remap:

  • Up 8.9% in July 2019
  • Up 4.5% for the full year
  • Up 11 of 12 months

Austin & Manor Get a Pickup

We brought the on-demand service Pickup back for CapMetro customers in Austin and Manor.

Residents of four Austin neighborhoods got to benefit from Pickup in August 2019:

  • Pickup East ATX
  • Pickup Exposition
  • Pickup Northeast ATX
  • Pickup Walnut Creek

Pickup Manor replaced a low-performing circulator route and was a hit right away, already increasing the route’s daily ridership numbers by 600%!

Electric Bus

A Busy 2019 Brings Great Results

It’s been an incredibly productive time for CapMetro, with a healthy mix of hard
work and big rewards:

  • Approved the purchase of the first four electric buses in Central Texas.
  • Received $2.6 million grant enabling us to increase the size of our electric bus fleet to 10.
  • Began work on a new bus yard for electric buses, with charging stations for 214 vehicles.
  • Broke ground on our new Downtown Station!
  • Added new track and other improvements that will increase MetroRail’s capacity.
  • Partnered with Austin Parks Foundation to increase summer service to Barton Springs.
  • Named 2019 Agency of the Year by the Texas Transit Association!

OCC

And the Hits Just Kept on Coming

There’s so much happening with transportation in Central Texas! Get a load of this:

  • Launched the first bus-only contraflow lane in partnership with the city of Austin.
  • Provided free rides for federal employees during government shutdown.
  • Opened new MetroRapid Stations along both lines, including Broken Spoke & 31st Street.
  • Re-launched MetroBike Shelter program with no annual fee.
  • Built new Operations Control Center, for more efficient and effective bus operations.
  • Received national safety award from American Public Transportation Association.

Project Connect

Project Connect

More Options • Better Transit • Serving More People

Project Connect will build on the foundation of Cap Remap and provide Central Texas a modern system of reliable and efficient public transit.

  • 2 lines of congestion-proof transit to better move people through downtown and connect ABIA to the larger system.
  • Fully electric fleet that provides dramatically lower emissions and modern technology to maintain our high quality of life.
  • More Park & Rides and Express Routes: Plus mobility hubs and neighborhood circulators throughout the region.

MetroRapid

New MetroRapid lines that will serve the entire city, including these corridors:

  • Tech Ridge
  • Cameron/Dessau
  • Burnet
  • Loyola
  • Manor
  • MLK
  • 7th Street
  • Pleasant Valley
  • South Lamar
  • Manchaca

The Community’s Plan

For Project Connect to work, we need your help. Here’s what we’ve been up to in the community:

  • 101 — community meetings held across 20 zip codes
  • 2,288 — visits received to our virtual open houses
  • 595 — comments collected from those visits

In Action

A Long-Term Vision Already in Action

Project Connect is a generational investment that is already improving Central Texas today!

  • Westgate Transit Center opened in June, removing up to 200 cars from the road.
  • In March, Downtown Station began renovations that will increase the frequency and capacity of MetroRail service!
  • A new facility in North Austin will make space for our all-electric bus fleet of the future.

2012 Earth Day Is Coming: How Are You Involved?

Earth DayEach year, we get one special day to celebrate Mother Earth and get involved in how we can help take care of our planet and be more eco-friendly.

This year, that special day falls on April 22.

So how will you be involved?

If you still don’t have plans, we’ve got you covered. So, keep reading…

At Capital Metro, being earth-friendly and staying “green” is important to us. And, we take pride in the fact that as a public transportation agency, we help reduce harmful air emissions and carbon-footprints by facilitating people riding together each day–not alone in their cars. Continue reading “2012 Earth Day Is Coming: How Are You Involved?”

New Tree Seedlings Planted Along North Austin Bus Routes

Tree Planting Day
Sustainable Neighborhoods and Capital Metro partner in efforts of planting more trees at bus stops.
Photo courtesy of Steven Zettner of Sustainable Neighborhoods

Trees — they help sustain the environment, and if you’re one of our MetroBus riders, you love to see them at the bus stops. They look nice, give you shade and keep you cooler during the summer. And, now we’re one step closer to seeing them at every bus stop thanks to the partnership between Capital Metro and volunteers from Sustainable Neighborhoods.

Earlier this month, over 25 volunteers went out to nine bus stops on Burnet and Anderson to plant two or three Mexican Plum and Texas Redbud tree seedlings at each site on March 11.

The seedlings were planted with a nifty new item called a Groasis Waterboxx, which will help water the seedlings for one year through a self-irrigation process. After a year, the trees should naturalize and not require subsequent watering when the re-useable Waterboxx can then be installed on another seedling.

The partnership is the beginning of a trial project for planting the street trees along Capital Metro bus routes.

“The tree seedlings are tiny – just 4″ liners,” Steven Zettner of Sustainable Neighborhoods said. “The waterboxxes are about the size of a large tire. They are donut shaped and wrap around the seedling, buffering it and emitting moisture very slowly. The waterboxx’s water bladder absorbs heat during the day and releases it at night, causing water to condensate and refill the bladder.”

Since the planting day, Sustainable Neighborhoods has been checking in on the bus stop seedlings and documenting their progress on their blog: http://www.snaustin.org/brainstorming/waterboxx

“Thanks in part to good rains, the waterboxxes have remained mostly full and the plants wet. Will be interesting to see how they fare over the summer if the rain stops,” according to one blog entry on March 23.

Tree Planting Day
Volunteers plant seedlings into Waterboxx containers.
Courtesy of Steven Zettner of Sustainable Neighborhoods

Now, there are 20 new Waterboxxes in North Austin and if the trial proves successful, it will signal a new method for planting trees at bus stops in an environmentally friendly mission that’s less expensive and labor-intensive.

“There are about 25 bus stops on Burnet between 2222 and 183, six have shaded shelters, two are at existing shaded locations, and we planted trees at 7 more,” Zettner said. “Assuming our trees make it, that will eventually double the shade quotient … and if this experiment pans out, we’ll be able to hit many other bus stops and sidewalk locations around NC Austin in the coming couple of years.”

The project has already helped to raise awareness and plant seedlings in North Austin that will one day help shade our riders and help the environment. If you stumble upon one of our little trees tell us how they’re doing and shoot us a picture of its progress. We can’t wait to see them full-grown and hope the project can keep expanding to help plant more trees!